Wednesday, 9 January 2019

Saturday 12 January 2019 Cuttagee dawn paddle

Our esteemed leader, desirous of a dawn paddle, demanded an early start – meet down at the water at 4.00am thus various alarm clocks were set for 3.00am! G&R arrived as we were collecting S&V and their boats; G&R having sensibly dropped their boats off down at the lake the previous afternoon.
Se set off at 4.35am in the pitch dark, sunrise was still 1hour and 20minutes away.

P1121175

By the time we got around to the main lake dawn was breaking and we paused to take in the view down the lake toward the bridge.

P1121183 (2)

After 10 or 15 minutes we turned our boats and continued paddling up the lake

P1121191 (2)

And the morning mist continued to roll down the valley

P1121192 (2)

Making the turn that leads to Clear Waters lagoon

P1121200

Heading up the lagoon

P1121205

P1121207 (2)

Pulling in at 5.50am for morning tea

P1121210

The rising sun lights up the trees

P1121212

At 6.25am we took to our boats once again

P1121213 (2)

and made our way back down the lagoon

P1121218 (2)

and proceeded up the creek

P1121220

The reflections were mesmerising

P1121221 (2)

And beautiful

P1121222 (2)

Up beyond the Back Water’s ford

P1121231

Oh no, the water level had dropped quite dramatically since our venture up the creek.  On our last paddle the next pool had been full and S&V and I had been able to squirm our way through it. We made a vow that after the next time we have a rain ‘event’ we will put in the the Siltstone Track and paddle/drag the boats down the creek.

P1121235 (2)

Turning around we had to renegotiate the very recently fallen Pencil Cedar

P1121240

Which for L with his 17’ boat took some tricky maneuvering

P1121244

We paddled back down the creek

P1121248

Keeping a look out for G for whom the going had become to shallow

P1121252

S&V and L&I stopped in the sun in the far distance of the above pic for a quick leg stretch and a fag whilst R paddled on to find her beloved. Who, besides a quick nap had not been wasting his time whist waiting for us and had been doing a jelly fish survey, discovering that whilst the water ahead of us was thick with them, they stopped at the bend behind us.

P1121255 (3)

We followed the creek out into the lake and poddled our way home. On the way G and I stopped to chat with a kayak fisher, a nice bloke from Head of Cuttagee Road. We mutually deplored the commercial fisherman who has so depleted the fish stock in the lake, thereby allowing the jellyfish to flourish. Just as we were parting company his friend came along, his kayak powered by an electric engine causing G to suffer a severe case of engine envy.
Meanwhile the others continued to paddle on up the lake going under the bridge for a quick get out and look at the sea.
By 9.35am, we were off the water and only two boats remained to be loaded. We then retired to S&V’s who hosted us for a sumptuous breakfast – well as sumptuous as a breakfast can be without B.A.C.O.N Smile

AND   wait for it.......
here is a short video of our paddle, with musical accompaniment, put together by clever R using her magic new phone.

After pressing play, go to big screen and press play again.

Yay, R, Thankyou

Wednesday, 2 January 2019

Thursday 3 January 2019 Bermagui River

Once again well laid plans went up in smoke.  The original plan called for R&G and S&V to be on the water at the Bridge boat ramp at 8.00am, paddling upstream to meet L&I and our first time paddling guests L&D at our usual morning tea spot some 4.65kms up river at 9.30am and then we would all paddle back down together. This necessitated the up and back paddlers leaving home quite a bit earlier than our mob.  However at 7.30am the L half of our guests decided that a sleep in with the beloved pooch was a much better option than paddling on a grey and possibly rainy day, so at the last minute I rang to say that we would be joining the rest of the CKC from the start, having deemed that D, whilst not having paddled before, being a triathalete would be able to cope with the distance.

So from having plenty of time to get ready, we suddenly had no time, and like Bilbo Baggins we rushed out the door, forgetting essentials like phones and water bottles. We arrived at the boat ramp only a few minutes late to find lots of people but no CKC?? After unloading the boats and still no fellow CKC, L took a drive around to his favourite launch site, only to have the CKC paddle upstream, under the bridge soon after he disappeared from site. After indulging in a lively bit of abuse hurling back and forth across the water - its your fault, you changed the launch site, no its your fault for forgetting your phones etc etc I launched D and G sheperded him up to the others who were waiting just out of the area of chaos around the boat ramp.



L reappeared soon after and we we joined the others on the water about 8.15am and headed slowly up river on a slack tide as L gave D some basic paddle coaching.




Cruising up river on glassy water


Doing it easy



After L's coaching and a bit of practice, D was soon holding his own with the rest of us






I think L was hoping we could stop here, however we urged him to push on - his morning tea site selection being notoriously bad



He's on the lookout for somewhere else


Our usual morning tea spot being overrun with tents, we retreated a little down and across the river to this recently vacated campsite.


After an half and hour or so break, we took to the water once more about 10.20am for our return journey back downstream, this time assisted by the outgoing tide.


We poddled our way back down with the tide


On still, glassy water


 Whilst the others proceeded on under the bridge, D, L&I pulled out at the boat ramp at 11.15am


We packed up and loaded the boats and headed home to inform L, refreshed and happy after her sleep in, that chaos was coming as G&R and S&V were coming for lunch. In no time at all, L (ably assisted by D and me) prepared a splendid repast and then all we had to do was sit back and await the arrival of our fellow paddlers. A long and noisy lunch ensued and thus ended our days paddle.


Trip Notes:
High Tide: 8.05am 1.69m at Bermagui Bridge
Put in/Take Out: Slipway Beach 10.30kms
Put in/Take Out: Bridge boat ram 9.30kms

Sunday, 30 December 2018

Sunday 30 December 2018 Cuttagee

A little family paddle and picnic today.

After a bit of discussion we sorted out who was going in which boat and we got ready to launch


So it was Dad and the two kids (J and IF) in Big Red and Mum in Bluey




Faster, faster J kept saying - apparently a tough little cox in the making


 Dad having a rest whilst IF does the paddling


L coming into land at our picnic spot.


After our 45min lunch break we took to the water again and headed back down the lake.
IF did the most amazing job keeping in sync with her dad. Born to paddle, L&I decided



Having a float and looking the great big jellyfish


 Here's Mum, showing her form


Let's look for more jellyfish, said Dad


 A happy Mum and Dad and IF still in sync


A couple of the great big jellyfish



Looking at the stingray


On the home stretch


C'mon Mum, its easy.


We ended our 2 hour paddle about 2.30pm. Everyone having had a good time. The kids were fantastic and listened to instruction and we look forward to taking them paddling again. And IF did an amazing job, paddling for most of the 4.3kms