Sunday, 9 October 2016

Saturday 8/10. Bugsworth Basin Pt2

We had arranged for the same taxi to pick us up at Lyme Park at 4.15 and he was right on time.
Upon our return to Bugsworth Basin we found it was the turn of the mini machines to trot their stuff.
These next pics are really for Geoff and Betty, everyone else can turn off now of they like




Lawrence almost copped this one in the back of the knees. The kid driving was a mini me of his dad and helped his dad with dads full sized machine. But this little one was definitely the kids domain.


Spoke to the following bloke.  The only thing he hadn't made, including the fitting and turning, was the boiler. The boilers have to be professionally made otherwise they can't get insurance.  It took him over 400 hours


And finally, for Roger, as I think he had one of these


It was good to have a day away from the boat, specially spending it looking at a stately and walking in the grounds.






No comments:

Post a Comment